Changchun 130 m² SAC Injection Molding Cleanroom

Completed in Changchun, China, in 2025, this 130 m² SAC cleanroom provides ISO 7 and ISO 8 controlled areas for injection molding operations.

Explore this application

Completed in Changchun, China, in 2025, this 130 m² SAC project created controlled space for injection molding operations. The brief included ISO 7 and ISO 8 areas, requiring the enclosure and environmental systems to support two cleanliness zones within a compact industrial layout. A modular cleanroom was assembled on site using cleanroom wall panels and cleanroom ceiling systems coordinated with the equipment arrangement. The delivery package also included HVAC and filtration for the classified zones, lighting, electrical services, automation, and monitoring. On-site assembly was followed by commissioning and validation during the three-month delivery period. This case illustrates how SAC can adapt to an injection molding facility where room boundaries and service connections must follow the production layout. The client is identified only by its internal project name in the source record, while the public case title remains anonymized. No additional process or performance claims are made.

Changchun 130 m² SAC Injection Molding Cleanroom
130 m² Controlled area
3 months Delivery
ISO 7 / ISO 8 Cleanroom class
01
THE CHALLENGE

Working Around Real Project Constraints

Create approximately 130 m² of controlled space for injection molding, with ISO 7 and ISO 8 zoning coordinated around the site and equipment layout.

02
THE SOLUTION

Engineered for the Process

A site-assembled SAC modular cleanroom provided approximately 130 m² of ISO 7 and ISO 8 space for injection molding operations in Changchun.

SCOPE OF DELIVERY

A Coordinated Cleanroom Package

The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.

  • 01Site-assembled modular walls and ceiling for a 130 m² injection molding cleanroom
  • 02HVAC and filtration serving the ISO 7 and ISO 8 clean zones
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation
APPLICATION & SELECTION

Planning an Injection Molding Cleanroom

For a new injection molding project, start with the machine layout and the stages where parts need protection. The following planning points help define an SAC package with separate cleanliness zones.

Planning guidance for similar projects. The project snapshot and delivery scope above describe this case; the considerations below help define a new project brief.

Define the purpose of each zone

Identify where molding, part removal, inspection and transfer will occur. Specify the required environment for each activity, then review the room boundaries and connections as one design brief.

Review process emissions alongside particle control

Plastics-fume control depends on the material and processing conditions. Review resin information, operating temperatures and ventilation needs before selecting the room air system; assess local extraction where the process calls for it.

Include maintenance in the operating plan

Cleanroom operations extend to equipment transfer, cleaning and maintenance. Discuss how molds, tools and replacement parts will enter the space, and how servicing will be managed without losing control of the production environment.

DEFINE YOUR REQUIREMENTS

What to share for a similar project

Use these inputs to discuss the layout, interfaces and delivery scope with our team.

Explore site-assembled (SAC) solutions
  • Molding machines, mold-change routes and equipment dimensions
  • Required cleanliness zones and operating conditions
  • Material, personnel and finished-part transfer routes
  • Equipment heat loads, utilities and maintenance access
  • Available building space and installation window
PROJECT QUESTIONS

Planning an injection molding cleanroom

What should be supplied for an injection molding cleanroom quotation?

Share the machine and robot layout, resin types, heat-load information, utilities, maintenance clearances, personnel numbers and required room grades. Mark the points where parts leave the machine and enter inspection or packaging.

Does a particle-clean room replace plastics-fume controls?

Treat these as separate design questions. Review material information, processing conditions and potential exposure with the process team so ventilation and any necessary extraction are included in the brief.

How should a project with two cleanliness zones be specified?

Provide a room schedule identifying each zone, its activity, equipment and acceptance criteria. Also mark all personnel and material connections so the proposed interfaces can be reviewed before manufacture.