Define the purpose of each zone
Identify where molding, part removal, inspection and transfer will occur. Specify the required environment for each activity, then review the room boundaries and connections as one design brief.
Completed in Changchun, China, in 2025, this 130 m² SAC cleanroom provides ISO 7 and ISO 8 controlled areas for injection molding operations.
Completed in Changchun, China, in 2025, this 130 m² SAC project created controlled space for injection molding operations. The brief included ISO 7 and ISO 8 areas, requiring the enclosure and environmental systems to support two cleanliness zones within a compact industrial layout. A modular cleanroom was assembled on site using cleanroom wall panels and cleanroom ceiling systems coordinated with the equipment arrangement. The delivery package also included HVAC and filtration for the classified zones, lighting, electrical services, automation, and monitoring. On-site assembly was followed by commissioning and validation during the three-month delivery period. This case illustrates how SAC can adapt to an injection molding facility where room boundaries and service connections must follow the production layout. The client is identified only by its internal project name in the source record, while the public case title remains anonymized. No additional process or performance claims are made.
Create approximately 130 m² of controlled space for injection molding, with ISO 7 and ISO 8 zoning coordinated around the site and equipment layout.
A site-assembled SAC modular cleanroom provided approximately 130 m² of ISO 7 and ISO 8 space for injection molding operations in Changchun.
The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.
For a new injection molding project, start with the machine layout and the stages where parts need protection. The following planning points help define an SAC package with separate cleanliness zones.
Planning guidance for similar projects. The project snapshot and delivery scope above describe this case; the considerations below help define a new project brief.
Identify where molding, part removal, inspection and transfer will occur. Specify the required environment for each activity, then review the room boundaries and connections as one design brief.
Plastics-fume control depends on the material and processing conditions. Review resin information, operating temperatures and ventilation needs before selecting the room air system; assess local extraction where the process calls for it.
Cleanroom operations extend to equipment transfer, cleaning and maintenance. Discuss how molds, tools and replacement parts will enter the space, and how servicing will be managed without losing control of the production environment.
Use these inputs to discuss the layout, interfaces and delivery scope with our team.
Explore site-assembled (SAC) solutionsShare the machine and robot layout, resin types, heat-load information, utilities, maintenance clearances, personnel numbers and required room grades. Mark the points where parts leave the machine and enter inspection or packaging.
Treat these as separate design questions. Review material information, processing conditions and potential exposure with the process team so ventilation and any necessary extraction are included in the brief.
Provide a room schedule identifying each zone, its activity, equipment and acceptance criteria. Also mark all personnel and material connections so the proposed interfaces can be reviewed before manufacture.
Share your machine layout, cleanliness zones and material flow to discuss a site-assembled cleanroom brief.