Describe the testing workflow
List sample containers, daily throughput, preparation steps, instruments, chemical storage and waste collection. Map the space needed to receive a sample, perform the selected tests and retain or dispose of it. Instrument access and operator movement should be reviewed before the container layout is fixed.