Delivering Cleanrooms Worldwide
Home / Solutions / PAC · Case Study
PAC · Case Study

United States 150 m² PAC Biopharmaceutical Cleanroom

Completed in the United States in 2020, this 150 m² PAC cleanroom provides an ISO 7 environment for biopharmaceutical applications.

Explore this application

This 150 m² biopharmaceutical cleanroom was completed in the United States in 2020. The requirement was an ISO 7 environment delivered through pre-assembled modules, with particular attention to international transport and integration at the destination. The PAC solution combined the wall and ceiling enclosure with HVAC, filtration, lighting, electrical systems, automation, and monitoring. Module connection, cleanroom installation, commissioning, and validation formed part of the on-site work. The recorded lead time was two months. As a prefabricated cleanroom project, it demonstrates how modular cleanroom systems can transfer a substantial portion of assembly into a controlled preparation phase while retaining site-specific connection work. The scale is suitable for a defined biopharmaceutical operation rather than a full building-wide cleanroom. The client remains anonymous, and the public project record does not provide details of the process equipment or qualification test results.

United States 150 m² PAC Biopharmaceutical Cleanroom
150 m² Controlled area
2 months Delivery
ISO 7 Cleanroom class
01
THE CHALLENGE

Working Around Real Project Constraints

Create approximately 150 m² of ISO 7 biopharmaceutical clean space with pre-assembled modular delivery and overseas site integration.

02
THE SOLUTION

Engineered for the Process

Pre-assembled PAC cleanroom modules provided 150 m² of ISO 7 space for biopharmaceutical use in the United States.

SCOPE OF DELIVERY

A Coordinated Cleanroom Package

The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.

  • 01Pre-assembled modular walls and ceiling for a 150 m² biopharmaceutical cleanroom
  • 02HVAC and filtration serving the ISO 7 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site module installation, commissioning and validation
APPLICATION & SELECTION

Planning an ISO 7 PAC Biopharmaceutical Cleanroom

For a similar overseas project, assess the process environment and the destination interfaces together so that factory preparation and site readiness support the same handover plan.

Planning guidance for similar projects. The project snapshot and delivery scope above describe this case; the considerations below help define a new project brief.

Separate room cleanliness from process protection

ISO 7 describes airborne particle cleanliness. It does not by itself establish an aseptic process. If sterile drug operations are proposed, identify the critical processing steps and the additional contamination controls and qualification evidence they require, rather than treating the room class as the complete specification.

Prepare a destination interface schedule

Confirm utility characteristics, connection positions, site access and responsibility for unloading and final installation before shipment. Include the process equipment supplier in that review. A coordinated interface schedule helps avoid discovering an incompatible service connection after the cleanroom modules arrive.

Plan site verification after integration

Define the checks that will demonstrate the completed facility's intended performance after transport, assembly and equipment installation. If aseptic manufacturing is intended, the qualification plan needs appropriate microbiological and process controls alongside particle classification. Agree responsibilities and required records before accepting the supply scope.

DEFINE YOUR REQUIREMENTS

What to share for a similar project

Use these inputs to discuss the layout, interfaces and delivery scope with our team.

Explore pre-assembled (PAC) solutions
  • Process description, equipment and required operating conditions
  • Room layout and personnel/material transfer routes
  • Transport route, delivery access and lifting constraints
  • Available electrical, HVAC and other utility interfaces
  • Factory/site test scope and handover responsibilities
PROJECT QUESTIONS

Planning an overseas PAC cleanroom project

Does an ISO 7 room establish FDA compliance?

No. FDA explains that ISO cleanroom classification standards alone are insufficient to qualify an aseptic sterile-drug facility. The intended process, applicable requirements and supporting evidence must be assessed together. A room classification is one part of that assessment.

What should an overseas PAC scope define?

Define shipping and delivery responsibilities, utility interfaces, installation support, site tests, documentation and operator handover. Also agree who supplies process equipment and who verifies its connection to the room services. These decisions are project-specific and should be visible in the quotation.

Can another 150 m² project use the same delivery period?

This case records two months. A new schedule should be based on the approved design, selected equipment, shipping route, site readiness and agreed acceptance activities. The same floor area does not establish an equivalent delivery program.