Completed in Shanghai in 2026, this 240 m² PAC modular laboratory provides an ISO 8 environment for biopharmaceutical applications.

Explore this application

Completed in Shanghai in 2026, this project supplied approximately 240 m² of ISO 8 laboratory space for biopharmaceutical use. The brief specified a PAC format suitable for factory pre-assembly, transport, and connection at the destination. Wonclean supplied pre-assembled modular laboratory units rather than building the full enclosure room by room at the site. The scope covered modular walls and cleanroom ceiling panels, HVAC and filtration, lighting, electrical systems, automation, monitoring, module installation, commissioning, and validation. The prefabricated laboratory approach brought several coordinated elements together before shipment while leaving final site interfaces to be completed after delivery. Its recorded lead time was three months. At 240 m², this case is larger than a single small research pod and shows how PAC can be applied to a more substantial laboratory requirement. The available public data does not describe the research process or equipment list.

Shanghai 240 m² PAC Modular Biopharmaceutical Laboratory
240 m² Controlled area
3 months Delivery
ISO 8 Cleanroom class
01
THE CHALLENGE

Working Around Real Project Constraints

Create approximately 240 m² of ISO 8 modular laboratory space suitable for factory pre-assembly, transport and site connection.

02
THE SOLUTION

Engineered for the Process

Pre-assembled PAC laboratory modules provided approximately 240 m² of ISO 8 space for biopharmaceutical use in Shanghai.

SCOPE OF DELIVERY

A Coordinated Cleanroom Package

The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.

  • 01Pre-assembled modular walls and ceiling for a 240 m² biopharmaceutical modular laboratory
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site module installation, commissioning and validation
APPLICATION & SELECTION

Planning a 240 m² Modular Biopharmaceutical Laboratory

For a laboratory at this scale, develop the room program and equipment-service plan together so that individual work areas function as one coordinated facility.

Planning guidance for similar projects. The project snapshot and delivery scope above describe this case; the considerations below help define a new project brief.

Turn laboratory activities into a room program

Identify sample receipt, preparation, analytical work, storage, cleaning and waste activities that the planned laboratory needs. Review which can share space and which require separation. Allocate equipment footprints, operator access and service routes before dividing the overall area into modules.

Assess biological risks independently

For work with biological materials, select safeguards through a protocol-specific risk assessment. Assess particle cleanliness and biological containment separately when developing the laboratory brief.

Coordinate shared services and future changes

Prepare an equipment schedule showing power, data, water, drainage, gases and any extraction needs. Agree connection positions and maintenance access across the planned rooms. If future instruments or additional work areas are expected, describe them in the brief so that service allowances and connection options can be reviewed early.

DEFINE YOUR REQUIREMENTS

What to share for a similar project

Use these inputs to discuss the layout, interfaces and delivery scope with our team.

Explore pre-assembled (PAC) solutions
  • Laboratory workflows, room functions and equipment list
  • Personnel, sample and waste-transfer routes
  • Environmental requirements for each activity
  • Module arrangement, building access and site services
  • Potential future layout changes and handover requirements
PROJECT QUESTIONS

Planning a modular biopharmaceutical laboratory

Does ISO 8 identify the laboratory's biosafety level?

No. ISO 8 addresses airborne particle cleanliness. Biosafety measures depend on biological materials, procedures and associated risks. The biosafety review should establish the appropriate practices, safety equipment and facility safeguards for the planned work.

Are benches and analytical instruments automatically included?

The supply boundary should identify them explicitly. Send the required furniture and instrument schedules, then confirm who supplies, installs and connects each item. This allows the laboratory enclosure and building services to be coordinated with the actual equipment package.

How should I compare a larger PAC laboratory with a small unit?

Compare the room functions, number of users, equipment and service loads, circulation and maintenance access. Total area alone is not enough. A room-by-room program helps establish whether the proposed modular arrangement supports the laboratory's workflow.

START YOUR PROJECT

Build a laboratory brief around your workflow

Send your room functions, equipment list and transfer routes to discuss a modular laboratory arrangement.