SAC · Case Study

Beijing 3,000 m² SAC Biopharmaceutical Cleanroom

Completed in Beijing in 2023, this 3,000 m² SAC cleanroom supports biopharmaceutical operations and targets ISO 8 cleanliness.

Explore this application
This Beijing project delivered 3,000 m² of clean space for a biopharmaceutical client in 2023. The brief called for ISO 8 conditions across a large area, with zoning that could be assembled efficiently within the existing site. A site-assembled modular cleanroom was selected to organize the space around the client's operating requirements. The package combined cleanroom wall panels and cleanroom ceiling systems with HVAC, filtration, lighting, electrical services, automation, and monitoring. Coordinating these elements as one scope helped define the interfaces between rooms and services before installation. On-site assembly was followed by commissioning and validation work. The recorded delivery period was six months. This case illustrates how the SAC approach can address a large biopharmaceutical footprint while keeping the enclosure, environmental systems, and site work aligned. The published information does not identify the client or disclose process-specific details.
Beijing 3,000 m² SAC Biopharmaceutical Cleanroom
3,000 m² Controlled area
6 months Delivery
ISO 8 Cleanroom class
01
THE CHALLENGE

Working Around Real Project Constraints

Create approximately 3,000 m² of ISO 8 biopharmaceutical clean space with large-area zoning and efficient site assembly.

02
THE SOLUTION

Engineered for the Process

A site-assembled SAC modular cleanroom was delivered for approximately 3,000 m² of ISO 8 biopharmaceutical space in Beijing.

SCOPE OF DELIVERY

A Coordinated Cleanroom Package

The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.

  • 01Site-assembled modular walls and ceiling for a 3,000 m² biopharmaceutical cleanroom
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation
APPLICATION & SELECTION

Planning a Large Biopharmaceutical Cleanroom

For a new biopharmaceutical facility, organise the brief around the process sequence and room functions. Show where materials, people, equipment and waste move before defining the modular envelope package.

Planning guidance for similar projects. The project snapshot and delivery scope above describe this case; the considerations below help define a new project brief.

Use the process flow to define the layout

FDA facility guidance emphasises space, cleaning access and the movement of people and materials as contamination-control considerations. Identify the actual manufacturing stage and product exposure before selecting room relationships and segregation measures.

Plan for cleaning and maintenance

A facility layout should support operations as well as cleaning. Review the proposed equipment arrangement, access and changeover activities with the process team so cleaning and contamination controls inform the room design.

Define monitoring and handover responsibilities

A cleanroom monitoring plan is based on intended use and relevant risks. Agree which environmental conditions will be monitored, who will review the records and how changes to the process or installation will trigger a review.

DEFINE YOUR REQUIREMENTS

What to share for a similar project

Use these inputs to discuss the layout, interfaces and delivery scope with our team.

Explore site-assembled (SAC) solutions
  • Production activities, product exposure and room schedule
  • Environmental requirements and acceptance criteria by zone
  • Personnel, material, equipment and waste routes
  • Building services, equipment interfaces and installation phases
  • Documentation, commissioning and handover scope
PROJECT QUESTIONS

Planning a large biopharmaceutical cleanroom

Does ISO 8 alone establish suitability for sterile production?

Particle classification alone does not characterise microbiological conditions. A sterile process requires a separate assessment of the process, contamination controls and qualification strategy against the applicable requirements.

What should be provided for a large-area cleanroom proposal?

Share the process description, room data sheets, equipment list, personnel and material flows, utility needs and intended construction phases. Identify the owner requirements and the acceptance documentation expected for each room.

How can phased delivery be defined clearly?

Request a zone-by-zone programme showing the proposed room releases, service connections and handover documents. Agree how the delivery period will be measured and distinguish fabrication, transport, installation and acceptance milestones.

START YOUR PROJECT

Develop a cleanroom brief for your biopharmaceutical facility

Share the room schedule, process flows and construction phases to discuss a coordinated SAC cleanroom package.