This 1,275 m² animal-facility project was completed in Shanghai in 2026 for a confidential research institution. Its requirement was an ISO 7 clean environment suitable for biopharmaceutical research use. The selected SAC modular cleanroom approach allowed the enclosure to be assembled on site and arranged around the facility's functional areas. The delivery scope included cleanroom partition systems, cleanroom ceiling panels, HVAC and filtration, lighting, electrical services, automation, and monitoring. Installation, commissioning, and validation were also included in the project package. Working through these elements together is important in an animal facility, where room boundaries, environmental services, and access need to be coordinated with the operating layout. The recorded lead time was three months. This case shows how a site-assembled system can serve a research facility of moderate scale without presenting unverified claims about equipment, workflows, or achieved operating performance.
Shanghai 1,275 m² SAC Animal Facility Cleanroom
1,275 m² Controlled area
3 months Delivery
ISO 7 Cleanroom class
01
THE CHALLENGE

Working Around Real Project Constraints

Create approximately 1,275 m² of ISO 7 clean space for an animal facility used in biopharmaceutical research.

02
THE SOLUTION

Engineered for the Process

A site-assembled SAC modular cleanroom was delivered for approximately 1,275 m² of ISO 7 animal-facility space in Shanghai.

SCOPE OF DELIVERY

A Coordinated Cleanroom Package

The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.

  • 01Site-assembled modular walls and ceiling for a 1,275 m² animal-facility cleanroom
  • 02HVAC and filtration serving the ISO 7 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation
APPLICATION & SELECTION

Planning an Animal Research Facility Envelope

Define the research activities, animal-care operation and risk assessment before selecting room finishes and environmental services.

Planning guidance for similar projects. The project snapshot and delivery scope above describe this case; the considerations below help define a new project brief.

Map clean and soiled circulation

NIH planning guidance considers animals, personnel, caging, supplies and waste as connected flows. Review functional zones and sanitation routes with the facility team before fixing corridor arrangements, door positions and transfer interfaces.

Define protection and containment objectives

Select safeguards through a protocol-specific risk assessment. Define pressure, access and ventilation around the actual research and animal-care needs.

Plan surfaces for routine sanitation

Review cleanable surfaces, sealed penetrations and sanitation methods alongside cage traffic and service openings.

DEFINE YOUR REQUIREMENTS

What to share for a similar project

Use these inputs to discuss the layout, interfaces and delivery scope with our team.

Explore site-assembled (SAC) solutions
  • Research activities, animal housing and room functions
  • Facility-specific risk assessment and environmental targets
  • Personnel, cages, feed, waste and equipment routes
  • Ventilation strategy and building service interfaces
  • Cleaning methods, maintenance access and acceptance plan
PROJECT QUESTIONS

Planning controlled spaces for an animal facility

Does ISO 7 define an animal biosafety level?

Containment safeguards are selected through assessment of the work, materials and procedures. Specify the animal-facility risk assessment and containment objectives separately from the room's airborne particle target.

Which inputs are needed for an animal-facility proposal?

Provide the room list, animal-care and research brief, cage-system information, clean and soiled routes, cleaning approach, equipment layout and owner-approved environmental requirements. Identify the teams responsible for veterinary, biosafety and building-design review.

Why review cage-wash and waste routes early?

Sanitation, storage and logistics occupy functional space and connect with holding and procedure areas. Planning these relationships early helps the facility team assess circulation rather than sizing the enclosure around animal rooms alone.

START YOUR PROJECT

Plan the enclosure around your animal facility workflow

Share the functional zones, facility requirements and transfer routes to discuss a coordinated cleanroom enclosure scope.